Sandwell Aquatic Centre

After successfully hosting the Games’ swimming and diving events, the new Sandwell Aquatics Centre is now ready to move onto the next phase. The facility is currently being transformed into a state-of-the-art local leisure centre for Sandwell and the region and will open to the public in summer 2023.

It will include a 50 metre Olympic-size swimming pool, a 10-metre-high competitive dive tower and a 25-metre dive pool, along with 1,000 spectator seats.

In addition, the centre will also boast the following facility mix:

  • A community swimming pool.
  • Three 150sqm activity studios.
  • Two 4-court sports halls.
  • 108-station gym.
  • 25-station ladies-only gym.
  • Indoor cycling studio.
  • Changing village for up to 600.
  • Dry diving centre with mini floor trampolines.
  • Sauna/steam room.
  • New football pitch and changing facilities.
  • New urban park and children's play area.

We have a range of roles available and up-and-coming in the future, so keep an eye on our page!

Aquatic

Aquatic2

Aquatic3

Aquatic5